Queensway Expansion East

Reports / Presentations

Project Reports

Throughout the project, various reports will be prepared including a Design and Construction Report which will document the Recommended Plan as well as environmental protection and mitigation measures. These reports will be posted here as they become available.

A Design and Construction Report (DCR) has been prepared and is available from May 29, 2017 to June 27, 2017 for a 30-day public review period. The DCR is available via the following links:

Presentations

Presentations will be posted here as they become available.

Display materials presented at the PIC are accessible via the following link: