Queensway Expansion East

Reports / Presentations

Project Reports

Throughout the project, various reports will be prepared including a Public Information Centre (PIC) summary report and a Design and Construction Report which will document the Recommended Plan as well as environmental protection and mitigation measures. These reports will be posted here as they become available.

A Design and Construction Report (DCR) has been prepared and is available from September 24, 2014 to October 24, 2014 for a 30-day public review period. The DCR is available via the following link.

Presentations

Presentations will be posted here as they become available.

Display materials presented at the PIC are accessible via the following links: