Queensway Expansion East

Reports / Presentations

Project Reports

Throughout the project, various reports will be prepared including technical reports documenting environmental investigations, a Public Information Centre summary report and a Design and Construction Report which will document the Recommended Plan as well as environmental protection and mitigation measures. These reports will be posted here as they become available.

A Design and Construction Report (DCR) has been prepared and was available from May 14, 2012 to June 14, 2012 for a 30-day public review period. The DCR is available via the following links.

[media-tags media_tags=”Project1 Reports” display_item_callback=”display_pdf_list”]

Presentations

Presentations will be posted here as they become available.

Display materials presented at the PIC are accessible via the following links:

[media-tags media_tags=”Project1 Presentations” display_item_callback=”display_pdf_list”]

Nicholas to VanierVanier Parkway to Ottawa Road 174